<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Halpe Inc.</title>
	<atom:link href="http://www.halpeinc.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.halpeinc.com</link>
	<description>Halpe Inc.</description>
	<lastBuildDate>Sun, 22 Jan 2012 19:17:10 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>Harlows Casino and Resort</title>
		<link>http://www.halpeinc.com/2011/11/harlows-casino-and-resort/</link>
		<comments>http://www.halpeinc.com/2011/11/harlows-casino-and-resort/#comments</comments>
		<pubDate>Mon, 07 Nov 2011 21:45:18 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Private-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=438</guid>
		<description><![CDATA[Greenville, Mississippi
The exciting Harlow’s Casino and Resort in Greenville, Mississippi, was designed to provide one-shop entertainment for all guests.  Built upon the idea of a 33,000 square foot floating casino on a tributary of the Mississippi River, the owners of Harlow’s envisioned a hotel with premium restaurants, fine accommodations, and multiple venues of entertainment. <a href="http://www.halpeinc.com/2011/11/harlows-casino-and-resort/"></a>]]></description>
			<content:encoded><![CDATA[<div id="attachment_445" class="wp-caption alignnone" style="width: 970px"><a href="http://www.halpeinc.com/2011/11/harlows-casino-and-resort/harlows-casino-and-resort-copy-3/" rel="attachment wp-att-445"><img class="size-full wp-image-445" title="Harlows Casino and Resort copy" src="http://www.halpeinc.com/wp-content/uploads/Harlows-Casino-and-Resort-copy2.jpg" alt="" width="960" height="400" /></a><p class="wp-caption-text">Harlow&#39;s Casino and Resort</p></div>
<p>The exciting Harlow’s Casino and Resort in Greenville, Mississippi, was designed to provide one-shop entertainment for all guests.  Built upon the idea of a 33,000 square foot floating casino on a tributary of the Mississippi River, the owners of Harlow’s envisioned a hotel with premium restaurants, fine accommodations, and multiple venues of entertainment.</p>
<p>HAL-PE served as a the lead mechanical, electrical, and plumbing designer on all phases of the project.  The multi-purpose arena will safely seat up to 2,500 guests for all forms of entertainment.  The in-house buffet restaurant and separate café provide guests with 24/7 dining options.  The hotel consists of over 100 luxurious rooms and suites with many rooms offering a Jacuzzi tub, and separate shower.  Finally, the HAL-PE designed the site electric for over 73 acres of primary electric distribution, parking and roadway lighting.</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/11/harlows-casino-and-resort/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Danville VAMC &#8211; Renovate Shower and Toilet Spaces</title>
		<link>http://www.halpeinc.com/2011/11/danville-vamc-renovate-shower-and-toilet-spaces/</link>
		<comments>http://www.halpeinc.com/2011/11/danville-vamc-renovate-shower-and-toilet-spaces/#comments</comments>
		<pubDate>Mon, 07 Nov 2011 16:59:04 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Federal-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=415</guid>
		<description><![CDATA[Danville, VAMC - Danville, IL
In 2011, HAL-PE was contracted to prepare construction documents to renovate seven shower and toilet room spaces in Building 101 on the Danville, Illinois VAMC campus.  The general intent of the project was to allow for more patient privacy, while improving the mechanical, electrical and plumbing systems in these spaces.  The new design would provide for new flooring, wall finishes, ceiling systems, and all new plumbing fixtures. <a href="http://www.halpeinc.com/2011/11/danville-vamc-renovate-shower-and-toilet-spaces/"></a>]]></description>
			<content:encoded><![CDATA[<p>&nbsp;</p>
<div id="attachment_417" class="wp-caption alignnone" style="width: 970px"><a href="http://www.halpeinc.com/2011/11/danville-vamc-renovate-shower-and-toilet-spaces/danville-vamc-rendering/" rel="attachment wp-att-417"><img class="size-full wp-image-417" title="Danville VAMC Rendering" src="http://www.halpeinc.com/wp-content/uploads/Danville-VAMC-Rendering.jpg" alt="" width="960" height="400" /></a><p class="wp-caption-text">Renovate Shower and Toilet Rooms</p></div>
<p>In 2011, HAL-PE was contracted to prepare construction documents to renovate seven shower and toilet room spaces in Building 101 on the Danville, Illinois VAMC campus.  The general intent of the project was to allow for more patient privacy, while improving the mechanical, electrical and plumbing systems in these spaces.  The new design would provide for new flooring, wall finishes, ceiling systems, and all new plumbing fixtures.</p>
<p>This project is being designed with BIM software and systems to provide the VAMC with the best coordinated and executable design possible.  The image shown above is a finished rendering from the AutoCAD Revit program.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/11/danville-vamc-renovate-shower-and-toilet-spaces/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Summit Lakes &#8211; Waterfall Mechanicals</title>
		<link>http://www.halpeinc.com/2011/10/summit-lakes-waterfall-mechanicals/</link>
		<comments>http://www.halpeinc.com/2011/10/summit-lakes-waterfall-mechanicals/#comments</comments>
		<pubDate>Thu, 20 Oct 2011 11:59:44 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Private-Construction]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=408</guid>
		<description><![CDATA[Crestview Hills, Kentucky
HAL-PE's scope of work involved the design and installation of the mechanical pumping systems to operate the scenic waterfall at the Summit Lakes complex in Crestview Hills, Kentucky.  The work revolved around the installation of a 6"  Backwater Valve  and adding a sump pump to the pit to ensure the lake's overflow would not flood the pit's pump motor. <a href="http://www.halpeinc.com/2011/10/summit-lakes-waterfall-mechanicals/"></a>]]></description>
			<content:encoded><![CDATA[<p>HAL-PE&#8217;s scope of work involved the design and installation of the mechanical pumping systems to operate the scenic waterfall at the Summit Lakes complex in Crestview Hills, Kentucky.  The work revolved around the installation of a 6&#8243;  Backwater Valve  and adding a sump pump to the pit to ensure the lake&#8217;s overflow would not flood the pit&#8217;s pump motor.<a href="http://www.halpeinc.com/2011/10/summit-lakes-waterfall-mechanicals/summit-lakes/" rel="attachment wp-att-409"><img class="alignnone size-full wp-image-409" title="Summit Lakes" src="http://www.halpeinc.com/wp-content/uploads/Summit-Lakes.jpg" alt="" width="960" height="400" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/10/summit-lakes-waterfall-mechanicals/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Chalmers P. Wylie Ambulatory Care Center &#8211; New MRI Suite</title>
		<link>http://www.halpeinc.com/2011/10/chalmers-p-wylie-ambulatory-care-center-new-mri-suite/</link>
		<comments>http://www.halpeinc.com/2011/10/chalmers-p-wylie-ambulatory-care-center-new-mri-suite/#comments</comments>
		<pubDate>Tue, 18 Oct 2011 13:16:43 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Federal-Construction]]></category>
		<category><![CDATA[Federal-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=401</guid>
		<description><![CDATA[Chalmers P. Wylie Ambulatory Care Center, Columbus, Ohio
HAL-PE's requirement will be a design build type project to provide all design, labor, supervision, materials, and equipment to renovate approximately 1500 square feet of existing 1st floor maintenance area into a new MRI suite and some minor work in the new Biomedical Equipment Repair area.  <a href="http://www.halpeinc.com/2011/10/chalmers-p-wylie-ambulatory-care-center-new-mri-suite/"></a>]]></description>
			<content:encoded><![CDATA[<p>HAL-PE&#8217;s requirement will be a design build type project to provide all design, labor, supervision, materials, and equipment to renovate approximately 1500 square feet of existing 1st floor maintenance area into a new MRI suite and some minor work in the new Biomedical Equipment Repair area.</p>
<div id="attachment_402" class="wp-caption alignnone" style="width: 970px"><a href="http://www.halpeinc.com/2011/10/chalmers-p-wylie-ambulatory-care-center-new-mri-suite/chalmers-p-wylie-ambulatory-care-center/" rel="attachment wp-att-402"><img class="size-full wp-image-402" title="Chalmers P Wylie Ambulatory Care Center" src="http://www.halpeinc.com/wp-content/uploads/Chalmers-P-Wylie-Ambulatory-Care-Center.jpg" alt="" width="960" height="400" /></a><p class="wp-caption-text">Chalmers P Wylie Ambulatory Care Center</p></div>
<p>The MRI Suite will include a waiting area, reception room, interview &amp; preparation room, sub-wait area, MRI magnet room, equipment room and control room. The scope of work includes demolition and new construction of existing areas to allow for the installation of new MRI equipment. Project will include concrete, masonry metals, wood, plastics &amp; composites, thermal &amp; moisture, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical and communications.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/10/chalmers-p-wylie-ambulatory-care-center-new-mri-suite/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Cincinnati VAMC &#8211; Public Address System Replacement</title>
		<link>http://www.halpeinc.com/2011/10/cincinnati-vamc-public-address-system-replacement/</link>
		<comments>http://www.halpeinc.com/2011/10/cincinnati-vamc-public-address-system-replacement/#comments</comments>
		<pubDate>Tue, 18 Oct 2011 12:11:56 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Federal-Construction]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=381</guid>
		<description><![CDATA[Cincinnati, Ohio, Veterans Affairs Medical Center
HAL-PE was contracted to replace both the Public Address and Paging systems in the Cincinnati VA Medical Center Hospital complex as part of this Recovery and Reinvestment Act procurement.  <a href="http://www.halpeinc.com/2011/10/cincinnati-vamc-public-address-system-replacement/"></a>]]></description>
			<content:encoded><![CDATA[<div id="attachment_382" class="wp-caption alignnone" style="width: 970px"><a href="http://www.halpeinc.com/2011/10/cincinnati-vamc-public-address-system-replacement/cincinnati-vamc/" rel="attachment wp-att-382"><img class="size-full wp-image-382" title="Cincinnati VAMC" src="http://www.halpeinc.com/wp-content/uploads/Cincinnati-VAMC.jpg" alt="" width="960" height="400" /></a><p class="wp-caption-text">Cincinnati VA Medical Center</p></div>
<p>HAL-PE was contracted to replace both the Public Address and Paging systems in the Cincinnati VA Medical Center Hospital complex as part of this Recovery and Reinvestment Act procurement.  The project involved work in all major facilites, not limited to Buildings #1, #3, #6, #7, #8, #13, #15, the Fisher House, Trailer C, Safety Trailer and the Patient Safety Trailers #1 and #2.</p>
<p>HAL-PE provided all labor and materials based off the contract documents.  The project was finished on time and on schedule with no change orders except those requested by the government.  HAL-PE incurred no accidents or injuries during this project.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/10/cincinnati-vamc-public-address-system-replacement/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Southshore, Newport, KY</title>
		<link>http://www.halpeinc.com/2011/10/southshore-2/</link>
		<comments>http://www.halpeinc.com/2011/10/southshore-2/#comments</comments>
		<pubDate>Wed, 05 Oct 2011 17:15:15 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Private-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=350</guid>
		<description><![CDATA[Location: Newport, Kentucky
Description: HAL-PE was contracted to design the mechanical, electrical and plumbing systems on this first phase of a four-building project.  The 20-story tower consists of 16-story condominium built atop a 4-story parking garage. Three additional buildings, along with a marina, will be added to the complex in subsequent phases. The master plan calls for at least 200 condominiums and 130,000 sf of Class A office space. <a href="http://www.halpeinc.com/2011/10/southshore-2/"></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.halpeinc.com/2011/10/southshore-2/southshore-3/" rel="attachment wp-att-352"><img class="alignnone size-full wp-image-352" title="Southshore" src="http://www.halpeinc.com/wp-content/uploads/Southshore1.jpg" alt="" width="960" height="400" /></a>HAL-PE was contracted to design the mechanical, electrical and plumbing systems on this first phase of a four-building project.  The 20-story tower consists of 16-story condominium built atop a 4-story parking garage. Three additional buildings, along with a marina, will be added to the complex in subsequent phases. The master plan calls for at least 200 condominiums and 130,000 sf of Class A office space.</p>
<p>Currently, Southshore consists of the first tower with 73 units covering approximately<br />
173,600sf, a 175,000sf parking garage, a clubhouse and swimming pool atop the<br />
garage.  HAL-PE engineers had to work with local companies for all new utility services to the development.  All new primary electric had to be provided to the site and existing utilities relocated under the scope of work. The flexible design of the units allow the<br />
individual owners the opportunity to customize their space to meet their needs<br />
with lighting and low voltage requests.</p>
<p>The elevator main elevator shaft and the stair towers are equipped with pressurization systems integrated into the fire alarm system to control smoke migration during a fire.  HAL-PE provided the complete design, wrote a testing procedure, and administered the testing of the systems.</p>
<p>The emergency system consists of two generators located on the second floor of the<br />
garage to avoid the flood plain.  All emergency life safety systems, not limited to the voice notification of the fire alarm system located in the fire command center, were designed by HAL-PE.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/10/southshore-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Mountain Home VAMC &#8211; Upgrade Chilled Water System</title>
		<link>http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-johnson-city-tennessee/</link>
		<comments>http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-johnson-city-tennessee/#comments</comments>
		<pubDate>Thu, 29 Sep 2011 15:55:57 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Federal-Construction]]></category>
		<category><![CDATA[Federal-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=302</guid>
		<description><![CDATA[Location: Johnson City, Tennessee
Description: The scope of work is to expand the existing chilled water system capacity at the northeast end of the existing campus chilled water distribution loop in order to provide new redundant cooling systems for Buildings 162 and 37.  <a href="http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-johnson-city-tennessee/"></a>]]></description>
			<content:encoded><![CDATA[<div id="attachment_374" class="wp-caption alignnone" style="width: 970px"><a href="http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-johnson-city-tennessee/mountain-home/" rel="attachment wp-att-374"><img class="size-full wp-image-374" title="Mountain Home" src="http://www.halpeinc.com/wp-content/uploads/Mountain-Home.jpg" alt="" width="960" height="400" /></a><p class="wp-caption-text">Mountain Home Chiller Building</p></div>
<p>The scope of work is to expand the existing chilled water system capacity at the northeast end of the existing campus chilled water distribution loop in order to provide new redundant cooling systems for Buildings 162 and 37.</p>
<p>The new design will include a new cooling system to supply new cooling capacity for Buildings 162 and 37. System redundancy shall include new primary and secondary chiller(s)/chill water system and cooling tower(s)/condensing water system. At least one source of condensing water cooling shall be from geothermal wells unless investigation and calculations reveal that local site conditions do not provide adequate flow and/or heat sink.</p>
<p>Project Cost: $1,970,000</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-johnson-city-tennessee/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Lexington VAMC (Leestown Rd) &#8211; Upgrade Chilled Water System</title>
		<link>http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-lexington-ky-40511/</link>
		<comments>http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-lexington-ky-40511/#comments</comments>
		<pubDate>Thu, 29 Sep 2011 15:53:03 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Federal-Construction]]></category>
		<category><![CDATA[Federal-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=300</guid>
		<description><![CDATA[Location:  Lexington, KY 40511
Description: The intent of the project scope of work is to repair and replace up to three chilled water pumps, install a new plate and frame heat exchanger, and the replacement of a 600 ton cooling tower.   <a href="http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-lexington-ky-40511/"></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-lexington-ky-40511/lexington_chiller/" rel="attachment wp-att-328"><img class="aligncenter size-full wp-image-328" title="Lexington_Chiller" src="http://www.halpeinc.com/wp-content/uploads/Lexington_Chiller.jpg" alt="" width="960" height="400" /></a></p>
<p>The intent of the project scope of work is to repair and replace up to three chilled water pumps, install a new plate and frame heat exchanger, and the replacement of a 600 ton cooling tower.  In addition, HAL-PE had the requirement to update piping, valves, and controls to allow for full automation and use of any combination of chiller with any cooling tower.  All work is to be performed at the Building 67 Chiller Plant, which is to remain in operation (minimum of two (2) each chillers and cooling towers available) until the end of 2011 Cooling Season.</p>
<p>Project Cost: $650,000</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/09/upgrade-chilled-water-system-lexington-ky-40511/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>First Financial Bank  West Chester, OH 45069</title>
		<link>http://www.halpeinc.com/2011/09/first-financial-bank-west-chester-oh-45069/</link>
		<comments>http://www.halpeinc.com/2011/09/first-financial-bank-west-chester-oh-45069/#comments</comments>
		<pubDate>Thu, 29 Sep 2011 15:51:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Private-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=296</guid>
		<description><![CDATA[Location: West Chest, OH.
Description: HAL-PE Associates completed the mechanical, electrical, and plumbing design for First Financial Bank’s regional banking center in West Chester, Ohio.  <a href="http://www.halpeinc.com/2011/09/first-financial-bank-west-chester-oh-45069/"></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.halpeinc.com/2011/09/first-financial-bank-west-chester-oh-45069/ff/" rel="attachment wp-att-297"><img class="aligncenter size-full wp-image-297" title="ff" src="http://www.halpeinc.com/wp-content/uploads/ff.jpg" alt="" width="960" height="400" /></a></p>
<p>HAL-PE Associates completed the mechanical, electrical, and plumbing design for First Financial Bank’s regional banking center in West Chester, Ohio.  The mechanical systems included a VAV air handling system with chilled water cooling and hot water heating.  The chilled water system utilized an air cooled, scroll chiller with full thermal storage.  By generating ice during off-peak hours, the chiller was able to completely shut down during times of peak energy use.  This load shifting and peak metering provided substantial savings on the Bank’s electric utilities.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/09/first-financial-bank-west-chester-oh-45069/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>The Ascent, Covington, KY.</title>
		<link>http://www.halpeinc.com/2011/09/the-ascent-covington-ky/</link>
		<comments>http://www.halpeinc.com/2011/09/the-ascent-covington-ky/#comments</comments>
		<pubDate>Thu, 29 Sep 2011 15:47:15 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[ALL]]></category>
		<category><![CDATA[Private-Design]]></category>

		<guid isPermaLink="false">http://www.halpeinc.com/?p=292</guid>
		<description><![CDATA[Location: The Ascent, Covington, KY.
Description: HAL_PE Associates was contracted to design all the plumbing systems for the Ascent as part of a design-build contract under Ken Neyer Plumbing.    <a href="http://www.halpeinc.com/2011/09/the-ascent-covington-ky/"></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.halpeinc.com/2011/09/the-ascent-covington-ky/ascent/" rel="attachment wp-att-293"><img class="aligncenter size-full wp-image-293" title="ascent" src="http://www.halpeinc.com/wp-content/uploads/ascent.jpg" alt="" width="960" height="400" /></a></p>
<p>HAL_PE Associates was contracted to design all the plumbing systems for the Ascent as part of a design-build contract under Ken Neyer Plumbing.</p>
<p>More than a luxury condominium, The Ascent is an aesthetic statement and a towering architectural achievement. Its signature arcing profile invites a once-in-a-lifetime opportunity: to be part of an exclusive community that literally lives in an original work of art.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.halpeinc.com/2011/09/the-ascent-covington-ky/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

