The intent of the project scope of work is to repair and replace up to three chilled water pumps, install a new plate and frame heat exchanger, and the replacement of a 600 ton cooling tower. In addition, HAL-PE had the requirement to update piping, valves, and controls to allow for full automation and use of any combination of chiller with any cooling tower. All work is to be performed at the Building 67 Chiller Plant, which is to remain in operation (minimum of two (2) each chillers and cooling towers available) until the end of 2011 Cooling Season.
Project Cost: $650,000