NAS Jacksonville – Replace Utilities Under The Main Hospital

August 17, 2012

HAL-PE was contracted to provide the mechanical, electrical, and plumbing design for the replacement of the primary electrical busway, all sanitary, and all steam/condensate lines serving the main hospital from the crawl space under the facility.  A primary requirement of the project was to develop a baseline set of drawings of the existing utilities so as to confirm what was actually under the hospital.  HAL-PE produced a 3D model of the existing utilities to better assist the contractor...

Read more

Dayton VAMC – Renovate Nuclear Medicine

July 10, 2012

In 2012, HAL-PE was contracted to produce the Mechanical, Electrical and Plumbing construction documents for the proposed renovations of the Nuclear Medicine Clinic at the Dayton VA Medical Center.

Read more

Harlows Casino and Resort

November 7, 2011

The exciting Harlow’s Casino and Resort in Greenville, Mississippi, was designed to provide one-shop entertainment for all guests.  Built upon the idea of a 33,000 square foot floating casino on a tributary of the Mississippi River, the owners of Harlow’s envisioned a hotel with premium restaurants, fine accommodations, and multiple venues of entertainment. HAL-PE served as a the lead mechanical, electrical, and plumbing designer on all phases of the project.  The multi-purpose...

Read more

Danville VAMC – Renovate Shower and Toilet Spaces

November 7, 2011

  In 2011, HAL-PE was contracted to prepare construction documents to renovate seven shower and toilet room spaces in Building 101 on the Danville, Illinois VAMC campus.  The general intent of the project was to allow for more patient privacy, while improving the mechanical, electrical and plumbing systems in these spaces.  The new design would provide for new flooring, wall finishes, ceiling systems, and all new plumbing fixtures. This project is being designed with BIM...

Read more

Chalmers P. Wylie Ambulatory Care Center – New MRI Suite

October 18, 2011

HAL-PE's requirement was a Design-Build type project to provide all design, labor, supervision, materials, and equipment to renovate approximately 1500 square feet of existing 1st floor maintenance area into a new MRI suite and some minor work in the new Biomedical Equipment Repair area. The MRI Suite includes a waiting area,...

Read more

Cincinnati VAMC – Public Address System Replacement

October 18, 2011

HAL-PE was contracted to replace both the Public Address and Paging systems in the Cincinnati VA Medical Center Hospital complex as part of this Recovery and Reinvestment Act procurement.  The project involved work in all major facilites, not limited to Buildings #1, #3, #6, #7, #8, #13, #15, the Fisher House, Trailer C, Safety Trailer and the Patient Safety Trailers #1 and #2. HAL-PE provided all labor and materials based off the contract documents.  The project was finished on...

Read more

Southshore, Newport, KY

October 5, 2011

HAL-PE was contracted to design the mechanical, electrical and plumbing systems on this first phase of a four-building project.  The 20-story tower consists of 16-story condominium built atop a 4-story parking garage. Three additional buildings, along with a marina, will be added to the complex in subsequent phases. The master plan calls for at least 200 condominiums and 130,000 sf of Class...

Read more

Lexington VAMC (Leestown Rd) – Upgrade Chilled Water System

September 29, 2011

The intent of the project scope of work is to repair and replace up to three chilled water pumps, install a new plate and frame heat exchanger, and the replacement of a 600 ton cooling tower.  In addition, HAL-PE had the requirement to update piping, valves, and controls to allow for full automation and use of any combination of chiller with any...

Read more

Cincinnati Downtown Residence Inn, Cincinnati, Ohio 45202

September 29, 2011

The new Cincinnati Downtown Residence Inn by Marriot Hotels involved the total interior demolition and renovation of the Phelps Apartments located on 4th Street in downtown Cincinnati.  The building consists of 12 stories with a partial basement, over 132,000 square feet and 142 extended stay hotel suites. HAL-PE Associates was contracted to...

Read more

Butler County Imaging Center, Butler Co., OH.

September 29, 2011

Prexus Health Partner's Hamilton campus includes a surgery center, dialysis center, and medical and administrative offices.  HAL-PE Associates was contracted for the complete mechanical, electrical and plumbing engineering on the 24,000sf imaging center addition onto the existing surgery center.  This state-of-the-art facility, comprised of mainly radius...

Read more